The AI Map

Map › Georgia › Dunwoody

Is there a data center near Dunwoody, GA?

The nearest AI data center to Dunwoody, GA is xAI Atlanta, about 11 miles away (operating). 1 regular data center is listed in Dunwoody.

11 mito the nearest AI data center
3AI data centers within 50 miles
39regular data centers within 25 miles
~12,906homes' worth of power used by xAI Atlanta

AI data centers closest to Dunwoody

SiteStatusPowerDistance
xAI Atlanta
Atlanta, GA
Operating17 MW11 mi
Microsoft Fairwater Atlanta
Fayetteville, GA
Operating636 MW now, 1.5 GW planned34 mi
Project Bunkhouse
Stilesboro, GA
Planned1.8 GW planned35 mi
CoreWeave Dalton
Dalton, GA
Operating28 MW66 mi
CoreWeave Marble
Marble, NC
Operating65 MW89 mi
Meta Aiken
Trenton, SC
Operating69 MW143 mi
Meta Huntsville
Toney, AL
Operating146 MW150 mi
Meta Montgomery
Montgomery, AL
Operating153 MW156 mi

Regular data centers nearby

  • Lincoln Rackhouse Atlanta · Lincoln Rackhouse (Dunwoody, GA) · 0.0 mi
  • Atlanta Tech Village · Performive (Atlanta, GA) · 6.0 mi
  • DC BLOX ATL1 - Atlanta · DC BLOX (Atlanta, GA) · 6.6 mi
  • Colo@ (Buckhead) · Performive (Atlanta, GA) · 6.6 mi
  • Equinix AT4 - Atlanta · Equinix, Inc. (Atlanta, GA) · 7.6 mi
  • Flexential - Atlanta/Norcross (ATL1/2) · Flexential Corp. (Norcross, GA) · 7.6 mi
  • Coloblox Data Centers ATL1 · Coloblox Data Centers (Atlanta, GA) · 8.4 mi
  • Coloblox Data Centers ATL3 · Coloblox Data Centers (Atlanta, GA) · 8.5 mi
  • CoreSite - Atlanta (AT2) · CoreSite (Marietta, GA) · 8.9 mi
  • PhoenixNAP Atlanta · PhoenixNAP (Marietta, GA) · 8.9 mi

Power bills in Georgia

Georgia Power base rates frozen through 2028

Georgia regulators froze Georgia Power's base rates through 2028 while the utility plans for about 8,200 MW of new demand, much of it from data centers. Watchdogs say the growth is overestimated, and storm costs can still raise bills.

July 2025 · Source ↗

Home electricity prices rising nationwide

The US Energy Information Administration expects average home electricity prices to reach 18.2 cents per kWh in 2026, almost 5% higher than 2025, with demand from businesses including data centers a key reason. Some East Coast areas may see up to 7% a year.

May 2026 · Source ↗

Get alerts for Dunwoody

Sign up on the main map to get an email when a data center or public hearing is proposed near you.

Share

Open Dunwoody on the live map →