The AI Map

Map › Virginia › Virginia Beach

Is there a data center near Virginia Beach, VA?

The nearest AI data center to Virginia Beach, VA is CoreWeave Chester, about 84 miles away (operating). 1 regular data center is listed in Virginia Beach.

84 mito the nearest AI data center
0AI data centers within 50 miles
3regular data centers within 25 miles
~62,254homes' worth of power used by CoreWeave Chester

AI data centers closest to Virginia Beach

SiteStatusPowerDistance
CoreWeave Chester
Chester, VA
Operating82 MW84 mi
QTS Richmond campus
Sandston, VA
Operating562 MW87 mi
Tract Hanover Technology Park
Ashland, VA
Planned2.4 GW planned105 mi
AWS North Creek Technology Campus
Mineral, Louisa County, VA
Planned3 GW planned134 mi
AWS Wilderness Crossing
Orange County, VA
Planned1.5 GW planned141 mi
STACK NVA02
Manassas, VA
Operating85 MW158 mi
Google Bristow
Bristow, VA
Operating238 MW161 mi
Google Sterling (Arcola)
Sterling, VA
Operating77 MW172 mi

Regular data centers nearby

  • Globalinx Virginia Beach CLS · Globalinx Data Centers (Virginia Beach, VA) · 0.0 mi
  • Lumen Norfolk · Lumen Technologies Inc (Norfolk, VA) · 13.5 mi
  • EdgeConneX Norfolk (EDCNOR01) · EdgeConneX Inc. (Norfolk, VA) · 13.6 mi
  • QTS Richmond (RIC1) · QTS Realty Trust, Inc. (Sandston, VA) · 83.6 mi
  • QTS Richmond (RIC5) · QTS Realty Trust, Inc. (Sandston, VA) · 84.9 mi
  • Hosted Backbone Richmond1 · Hosted Backbone, LLC (Richmond, VA) · 98.7 mi
  • Flexential - Richmond (RIC01/02) · Flexential Corp. (Richmond, VA) · 98.7 mi
  • EdgeConneX Richmond (EDCRIC01) · EdgeConneX Inc. (Richmond, VA) · 99.7 mi
  • Pixel Factory Data Center · Pixel Factory (Ashland, VA) · 100.8 mi
  • AiNET DC-900S · AiNET (Washington, DC) · 156.0 mi

Power bills in Virginia

Dominion bills up about $16 a month

Virginia regulators approved a Dominion Energy increase of about $16 a month on a typical bill (to roughly $165), and created a new rate class from 2027 that makes large data centers sign 14-year contracts with minimum payments.

Nov 2025 · Source ↗

Grid region costs rising (PJM)

In PJM, the grid serving 13 states from Illinois to New Jersey, a record capacity auction pushed power costs up, with data centers named the main driver. Monthly bills were expected to rise more than 5%; in Columbus, Ohio, about $27 a month.

July 2025 · Source ↗

Home electricity prices rising nationwide

The US Energy Information Administration expects average home electricity prices to reach 18.2 cents per kWh in 2026, almost 5% higher than 2025, with demand from businesses including data centers a key reason. Some East Coast areas may see up to 7% a year.

May 2026 · Source ↗

Get alerts for Virginia Beach

Sign up on the main map to get an email when a data center or public hearing is proposed near you.

Share

Open Virginia Beach on the live map →