The AI Map

Map › California › Modesto

Is there a data center near Modesto, CA?

The nearest AI data center to Modesto, CA is Google Storey County, about 155 miles away (operating). 2 regular data centers are listed in Modesto.

155 mito the nearest AI data center
0AI data centers within 50 miles
2regular data centers within 25 miles
~122,231homes' worth of power used by Google Storey County

AI data centers closest to Modesto

SiteStatusPowerDistance
Google Storey County
Tahoe-Reno Industrial Center, NV
Operating161 MW155 mi
Tract Silver Springs Park
Silver Springs, NV
Planned1.6 GW planned156 mi
Tract TRIC Park
Sparks, NV
Planned2 GW planned157 mi
Stratos AI Campus
Lucin, UT
Planned9 GW planned457 mi
Meta Kuna
Kuna, ID
Operating152 MW470 mi
Delta Gigasite
Delta, UT
Being built10 GW planned470 mi
Joule Energy and Data Center Campus
Holden, UT
Being built4 GW planned483 mi
QTS Eagle Mountain
Eagle Mountain, UT
Being builtNot disclosed516 mi

Regular data centers nearby

  • Volt Modesto · Volt Broadband (Modesto, CA) · 0.2 mi
  • 801 Tenth Street Modesto (Ayera) · Ayera Technologies, Inc. (Modesto, CA) · 0.2 mi
  • EZ Network Systems · EZ Network Systems (Stockton, CA) · 28.9 mi
  • Equinix SV1/SV5/SV10 - Silicon Valley, San Jose · Equinix, Inc. (San Jose, CA) · 51.0 mi
  • Opus Interactive Silicon Valley (SJC01) · Opus Interactive (San Jose, CA) · 51.6 mi
  • Stack Infrastructure Silicon Valley SVY01 · Stack Infrastructure (San Jose, CA) · 51.6 mi
  • Equinix SV3 - Silicon Valley, San Jose · Equinix, Inc. (San Jose, CA) · 51.7 mi
  • Hurricane Electric Fremont 2 · Hurricane Electric (Fremont, CA) · 51.7 mi
  • Hurricane Electric Fremont 1 · Hurricane Electric (Fremont, CA) · 52.0 mi
  • CoreSite - Milpitas (SV2) · CoreSite (Milpitas, CA) · 52.7 mi

Power bills in California

Home electricity prices rising nationwide

The US Energy Information Administration expects average home electricity prices to reach 18.2 cents per kWh in 2026, almost 5% higher than 2025, with demand from businesses including data centers a key reason. Some East Coast areas may see up to 7% a year.

May 2026 · Source ↗

Get alerts for Modesto

Sign up on the main map to get an email when a data center or public hearing is proposed near you.

Share

Open Modesto on the live map →