Is there a data center near Memphis, TN?

The nearest AI data center to Memphis, TN is Colossus 2, about 8 miles away (operating). 4 regular data centers are listed in Memphis.

8 mito the nearest AI data center
4AI data centers within 50 miles
4regular data centers within 25 miles
~718,203homes' worth of power used by Colossus 2

AI data centers closest to Memphis

SiteStatusPowerDistance
Colossus 2
Memphis, TN
Operating946 MW now, 1.5 GW planned8 mi
xAI Southaven campus (MACROHARDRR)
Southaven, MS
Being built2 GW planned8 mi
Colossus 1
Memphis, TN
Operating340 MW11 mi
Google West Memphis
West Memphis, AR
Being builtNot disclosed15 mi
Paducah GDP AI Campus
Kevil, KY
Planned1.8 GW planned153 mi
Amazon Madison Mega Site
Canton, MS
Operating284 MW171 mi
Amazon Ridgeland
Ridgeland, MS
Operating228 MW183 mi
Meta Huntsville
Toney, AL
Operating146 MW183 mi

Regular data centers nearby

  • Level(3) Memphis · Lumen Technologies Inc (Memphis, TN) · 2.7 mi
  • EdgeConneX Memphis (EDCMEM01) · EdgeConneX Inc. (Memphis, TN) · 3.1 mi
  • Expedient Memphis · Expedient (Memphis, TN) · 8.0 mi
  • DataBank Memphis (MEM1) · DataBank, Ltd. (Memphis, TN) · 11.5 mi
  • ARE-ON Forrest City · AREON (Forrest City, AR) · 47.6 mi
  • C Spire Mississippi · C Spire (Starkville, MS) · 128.1 mi
  • Mainstream Little Rock · Mainstream Technologies (Little Rock, AR) · 134.9 mi
  • TierPoint Little Rock · TierPoint, LLC (Little Rock, AR) · 144.2 mi
  • Quad State Internet PAH1 Colocation · Quad State Internet LLC (Paducah, KY) · 157.5 mi
  • Quad State Internet METRO1 Colocation · Quad State Internet LLC (Metropolis, IL) · 158.7 mi

Power bills in Tennessee

Grid region costs rising (PJM)

In PJM, the grid serving 13 states from Illinois to New Jersey, a record capacity auction pushed power costs up, with data centers named the main driver. Monthly bills were expected to rise more than 5%; in Columbus, Ohio, about $27 a month.

July 2025 · Source ↗

Home electricity prices rising nationwide

The US Energy Information Administration expects average home electricity prices to reach 18.2 cents per kWh in 2026, almost 5% higher than 2025, with demand from businesses including data centers a key reason. Some East Coast areas may see up to 7% a year.

May 2026 · Source ↗