The AI Map

Map › Illinois › Lombard

Is there a data center near Lombard, IL?

The nearest AI data center to Lombard, IL is Joliet Technology Center, about 23 miles away (planned). 1 regular data center is listed in Lombard.

23 mito the nearest AI data center
3AI data centers within 50 miles
54regular data centers within 25 miles
~1.4 millionhomes' worth of power planned by Joliet Technology Center

AI data centers closest to Lombard

SiteStatusPowerDistance
Joliet Technology Center
Joliet, IL
Planned1.8 GW planned23 mi
Project Cardinal
Yorkville, IL
Planned1.8 GW planned26 mi
AWS Hobart Campus
Hobart, IN
Being built2.4 GW planned46 mi
Microsoft Fairwater Wisconsin
Mount Pleasant, WI
Operating369 MW now, 2.3 GW planned59 mi
Project Rainier (New Carlisle)
New Carlisle, IN
Operating1 GW now, 1.9 GW planned80 mi
OpenAI Stargate Wisconsin
Port Washington, WI
Being builtNot disclosed107 mi
Google Fort Wayne
Fort Wayne, IN
Being builtNot disclosed163 mi
Google Cedar Rapids
Cedar Rapids, IA
Being built600 MW planned189 mi

Regular data centers nearby

  • CyrusOne Chicago (Lombard) · CyrusOne Inc. (Lombard, IL) · 0.0 mi
  • Equinix CH7 - Westmont · Equinix, Inc. (Westmont, IL) · 3.9 mi
  • Serverfarm CH2 Oak Brook · Serverfarm (Oak Brook, IL) · 4.5 mi
  • NYI CH1 (800 Jorie Blvd) · New York Internet (Oak Brook, IL) · 4.5 mi
  • US Signal - Oak Brook · US Signal (Oak Brook, IL) · 4.6 mi
  • Centersquare Chicago (ORD4) · Centersquare (Lisle, IL) · 4.7 mi
  • CDC4 - 1808 Swift Dr · Colocation America (Oak Brook, IL) · 5.6 mi
  • DataBank Chicago (ORD4) · DataBank, Ltd. (Oak Brook, IL) · 5.6 mi
  • Aligned Chicago (ORD-01/02) · Aligned Data Centers (Northlake, IL) · 7.2 mi
  • Ascent - CH2 · Ascent, LLC (Northlake, IL) · 7.8 mi

Power bills in Illinois

Grid region costs rising (PJM)

In PJM, the grid serving 13 states from Illinois to New Jersey, a record capacity auction pushed power costs up, with data centers named the main driver. Monthly bills were expected to rise more than 5%; in Columbus, Ohio, about $27 a month.

July 2025 · Source ↗

Home electricity prices rising nationwide

The US Energy Information Administration expects average home electricity prices to reach 18.2 cents per kWh in 2026, almost 5% higher than 2025, with demand from businesses including data centers a key reason. Some East Coast areas may see up to 7% a year.

May 2026 · Source ↗

Get alerts for Lombard

Sign up on the main map to get an email when a data center or public hearing is proposed near you.

Share

Open Lombard on the live map →