The AI Map

Map › Texas › Anthropic Barber Lake

Anthropic Barber Lake

Being built AI data center in Colorado City, Texas, run by Cipher Mining · Anthropic.

300 MWplanned capacity
~227,760homes' worth of electricity, when complete

Details

Where
Colorado City, TX (approximate location)
Owner / operator
Cipher Mining · Anthropic
Timeline
Under construction; dates not published
Power
300 MW planned
Footprint
Not published
Noise
No decibel readings published for this site. Large data centers often run above 60 dB near homes, and backup generators can reach about 105 dB during tests.
Source
epoch.ai ↗

Energy and water figures are estimates based on power capacity and US averages.

What it could mean for power bills

Home electricity prices rising nationwide

The US Energy Information Administration expects average home electricity prices to reach 18.2 cents per kWh in 2026, almost 5% higher than 2025, with demand from businesses including data centers a key reason. Some East Coast areas may see up to 7% a year.

May 2026 · Source ↗

Towns near Anthropic Barber Lake

Other AI data centers nearby

SiteStatusDistance
IREN Sweetwater Campus
Sweetwater, TX
Being built27 mi
OpenAI Stargate Abilene
Abilene, TX
Operating70 mi
Crusoe Abilene expansion
Abilene, TX
Being built72 mi
Google Haskell County (2 sites)
Haskell County, TX
Being built84 mi
OpenAI Stargate Shackelford (Frontier)
Shackelford County, TX
Being built85 mi
CoreWeave Helios
Dickens County, TX
Operating95 mi

Nearest regular data centers

  • Amarillo Petroleum Building (Amarillo, TX) · 202 mi
  • Alpheus Fort Worth (307 W 7th St) (Fort Worth, TX) · 207 mi
  • QTS Fort Worth (FTW1) (Fort Worth, TX) · 213 mi
  • TierPoint Dallas Fort Worth (Fort Worth, TX) · 214 mi
  • Rackspace Dallas Grapevine (DFW1) (Grapevine, TX) · 221 mi

Share this site

See it on the map, and check your distance →