name,owner,town,state,latitude,longitude,status,current_mw,planned_mw,power_from,note,source Colossus 2,xAI (SpaceX),Memphis,TN,35.005,-90.035,Operating,946,1531,"Memphis Light, Gas and Water",World's largest AI data center by compute; still expanding.,https://epoch.ai/data/ai-data-centers Colossus 1,xAI (SpaceX),Memphis,TN,35.072,-90.118,Operating,340,,"Memphis Light, Gas and Water, plus on-site gas turbines",Former Electrolux plant; drew controversy over on-site gas turbines.,https://epoch.ai/data/ai-data-centers xAI Southaven campus (MACROHARDRR),xAI (SpaceX),Southaven,MS,34.958,-89.993,Being built,,2000,,Initial operations began in 2026; about 2 GW planned across the Memphis-area sites.,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Project Rainier (New Carlisle),Amazon · used by Anthropic,New Carlisle,IN,41.705,-86.48,Operating,1037,1925,,Largest AI data center by power; Trainium chips.,https://epoch.ai/data/ai-data-centers Microsoft Fairwater Atlanta,Microsoft,Fayetteville,GA,33.452,-84.505,Operating,636,1500,Georgia Power,Part of Microsoft's linked 'AI WAN' of supercomputers.,https://epoch.ai/data/ai-data-centers Microsoft Fairwater Wisconsin,Microsoft,Mount Pleasant,WI,42.703,-87.932,Operating,369,2263,We Energies,Planned to become the largest AI campus Epoch tracks (about 2.3 GW by 2028).,https://epoch.ai/data/ai-data-centers Google Pryor,Google,Pryor,OK,36.309,-95.318,Operating,368,,,TPU cluster in the MidAmerica Industrial Park.,https://epoch.ai/data/ai-data-centers Meta Prometheus,Meta,New Albany,OH,40.088,-82.77,Operating,471,1000,"AEP Ohio, plus on-site gas (Williams)",Meta's 1 GW supercluster; on-site gas generation planned.,https://epoch.ai/data/ai-data-centers Google New Albany,Google,New Albany,OH,40.07,-82.795,Operating,333,,,,https://epoch.ai/data/ai-data-centers AWS New Albany,Amazon,New Albany,OH,40.11,-82.722,Operating,213,,,,https://epoch.ai/data/ai-data-centers Google Columbus,Google,Columbus,OH,39.873,-82.99,Operating,303,,,,https://epoch.ai/data/ai-data-centers Google Lancaster,Google,Lancaster,OH,39.722,-82.6,Operating,137,,,,https://epoch.ai/data/ai-data-centers OpenAI Stargate Abilene,Oracle · used by OpenAI,Abilene,TX,32.528,-99.662,Operating,421,1200,AEP Texas,"Stargate's flagship campus, built by Crusoe.",https://epoch.ai/data/ai-data-centers Crusoe Abilene expansion,Crusoe · Microsoft,Abilene,TX,32.548,-99.64,Being built,,600,,"Expansion next to the Stargate campus, now tied to Microsoft.",https://epoch.ai/data/ai-data-centers OpenAI Stargate Shackelford (Frontier),Vantage · Oracle · OpenAI,Shackelford County,TX,32.56,-99.42,Being built,,1400,,"10-building, 1,200-acre campus.",https://epoch.ai/data/ai-data-centers OpenAI Stargate Milam (Project Freebird),SB Energy · SoftBank · OpenAI,"Burlington, Milam County",TX,30.965,-97.05,Being built,,1200,,,https://epoch.ai/data/ai-data-centers OpenAI Stargate New Mexico (Project Jupiter),Oracle · OpenAI,"Santa Teresa, Doña Ana County",NM,31.87,-106.7,Being built,,1750,On-site fuel cells (Bloom Energy) and gas,Powered partly by on-site fuel cells and gas.,https://epoch.ai/data/ai-data-centers OpenAI Stargate Michigan (The Barn),Related Digital · Oracle · OpenAI,Saline Township,MI,42.15,-83.8,Being built,,1383,DTE Electric,,https://epoch.ai/data/ai-data-centers OpenAI Stargate Wisconsin,Vantage · Oracle · OpenAI,Port Washington,WI,43.39,-87.88,Being built,,,,,https://epoch.ai/data/ai-data-centers OpenAI Stargate Lordstown,SoftBank · OpenAI,Lordstown,OH,41.163,-80.86,Being built,,300,,In a former auto plant.,https://epoch.ai/data/ai-data-centers Project Camellia,OpenAI,Effingham County,GA,32.37,-81.33,Planned,,3200,,,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Meta Hyperion,Meta,"Holly Ridge, Richland Parish",LA,32.47,-91.68,Being built,,5000,Entergy Louisiana (new gas plants),"About 2 GW by 2030, designed to scale toward 5 GW.",https://epoch.ai/data/ai-data-centers Meta Bowling Green,Meta,Bowling Green,OH,41.39,-83.62,Being built,,,Gas (Williams),,https://epoch.ai/data/ai-data-centers Meta Rosemount,Meta,Rosemount,MN,44.71,-93.08,Operating,178,,,,https://epoch.ai/data/ai-data-centers Meta Jeffersonville,Meta,Jeffersonville,IN,38.33,-85.67,Operating,178,,,,https://epoch.ai/data/ai-data-centers Meta Temple,Meta,Temple,TX,31.13,-97.33,Operating,178,,,,https://epoch.ai/data/ai-data-centers Meta Montgomery,Meta,Montgomery,AL,32.3,-86.2,Operating,153,,,,https://epoch.ai/data/ai-data-centers Meta Kuna,Meta,Kuna,ID,43.47,-116.37,Operating,152,,Idaho Power,,https://epoch.ai/data/ai-data-centers Meta Cheyenne,Meta,Cheyenne,WY,41.1,-104.76,Operating,152,,,,https://epoch.ai/data/ai-data-centers Meta Huntsville,Meta,Toney,AL,34.86,-86.7,Operating,146,,Tennessee Valley Authority,,https://epoch.ai/data/ai-data-centers Meta Eagle Mountain,Meta,Eagle Mountain,UT,40.33,-112.01,Operating,133,,"Rocky Mountain Power, plus a new Williams gas plant",,https://epoch.ai/data/ai-data-centers Meta Gallatin,Meta,Gallatin,TN,36.38,-86.47,Operating,87,,,,https://epoch.ai/data/ai-data-centers Meta Los Lunas,Meta,Los Lunas,NM,34.81,-106.79,Operating,87,,,,https://epoch.ai/data/ai-data-centers Meta Sarpy,Meta,Springfield,NE,41.08,-96.13,Operating,80,,,,https://epoch.ai/data/ai-data-centers Meta Aiken,Meta,Trenton,SC,33.7,-81.85,Operating,69,,,,https://epoch.ai/data/ai-data-centers Meta / QTS Hillsboro,QTS · Meta,Hillsboro,OR,45.55,-122.92,Operating,180,,Portland General Electric,,https://epoch.ai/data/ai-data-centers QTS Eagle Mountain,QTS,Eagle Mountain,UT,40.355,-112.035,Being built,,,,,https://epoch.ai/data/ai-data-centers Google Council Bluffs,Google,Council Bluffs,IA,41.21,-95.84,Operating,237,,,,https://epoch.ai/data/ai-data-centers Google Omaha,Google,Omaha,NE,41.32,-96.1,Operating,237,,,,https://epoch.ai/data/ai-data-centers Google Papillion,Google,Papillion,NE,41.12,-96.07,Operating,237,,,,https://epoch.ai/data/ai-data-centers Google Lincoln,Google,Lincoln,NE,40.87,-96.64,Operating,141,,,,https://epoch.ai/data/ai-data-centers Google Bristow,Google,Bristow,VA,38.76,-77.57,Operating,238,,,,https://epoch.ai/data/ai-data-centers Google Sterling (Arcola),Google,Sterling,VA,39,-77.45,Operating,77,,,,https://epoch.ai/data/ai-data-centers Google Mesa,Google,Mesa,AZ,33.38,-111.62,Operating,183,,,,https://epoch.ai/data/ai-data-centers Google Storey County,Google,Tahoe-Reno Industrial Center,NV,39.53,-119.47,Operating,161,,,,https://epoch.ai/data/ai-data-centers Google The Dalles,Google,The Dalles,OR,45.63,-121.2,Operating,154,,,,https://epoch.ai/data/ai-data-centers Google Kansas City,Google,Kansas City,MO,39.15,-94.47,Operating,105,,,,https://epoch.ai/data/ai-data-centers Google Midlothian,Google,Midlothian,TX,32.47,-96.99,Operating,103,,,,https://epoch.ai/data/ai-data-centers Google Red Oak,Google,Red Oak,TX,32.52,-96.8,Operating,77,,,,https://epoch.ai/data/ai-data-centers Google Cedar Rapids,Google,Cedar Rapids,IA,41.92,-91.7,Being built,,600,,,https://epoch.ai/data/ai-data-centers QTS Cedar Rapids,QTS,Fairfax,IA,41.92,-91.79,Being built,,616,Alliant Energy,,https://epoch.ai/data/ai-data-centers Google Fort Wayne,Google,Fort Wayne,IN,41.02,-85.08,Being built,,,,,https://epoch.ai/data/ai-data-centers Goodnight campus,Likely Google · built by Crusoe,"Claude, Armstrong County",TX,35.11,-101.36,Being built,,,,,https://epoch.ai/data/ai-data-centers Amazon Madison Mega Site,Amazon,Canton,MS,32.6,-90.07,Operating,284,,,Possibly part of Project Rainier.,https://epoch.ai/data/ai-data-centers Amazon Ridgeland,Amazon,Ridgeland,MS,32.43,-90.12,Operating,228,,Entergy Mississippi,Possibly part of Project Rainier.,https://epoch.ai/data/ai-data-centers AWS Berwick (Susquehanna),Amazon,Berwick,PA,41.09,-76.14,Operating,108,,,Next to the Susquehanna nuclear plant.,https://epoch.ai/data/ai-data-centers Amazon Falls Township campus,Amazon,Falls Township,PA,40.17,-74.79,Planned,,,,Part of Amazon's Pennsylvania AI campuses plan.,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Microsoft Goodyear,Microsoft,Goodyear,AZ,33.42,-112.39,Operating,202,,,,https://epoch.ai/data/ai-data-centers Microsoft West Des Moines (Osmium),Microsoft,Cumming,IA,41.48,-93.77,Operating,190,,,Where early OpenAI models were trained.,https://epoch.ai/data/ai-data-centers Microsoft San Antonio,Microsoft,San Antonio,TX,29.42,-98.67,Operating,122,,,Two buildings (SAT14 and SAT40).,https://epoch.ai/data/ai-data-centers Microsoft / Nebius Vineland,Nebius · Microsoft,Vineland,NJ,39.44,-75.02,Operating,50,300,,,https://epoch.ai/data/ai-data-centers QTS Richmond campus,QTS,Sandston,VA,37.52,-77.3,Operating,562,,Dominion Energy,Three buildings.,https://epoch.ai/data/ai-data-centers STACK NVA02,STACK Infrastructure,Manassas,VA,38.73,-77.54,Operating,85,,,,https://epoch.ai/data/ai-data-centers CoreWeave Chester,CoreWeave,Chester,VA,37.33,-77.38,Operating,82,,,,https://epoch.ai/data/ai-data-centers CoreWeave Denton,CoreWeave,Denton,TX,33.24,-97.2,Operating,262,,,,https://epoch.ai/data/ai-data-centers CoreWeave Helios,Galaxy · CoreWeave,Dickens County,TX,33.77,-100.82,Operating,132,1630,,,https://epoch.ai/data/ai-data-centers CoreWeave Ellendale (Polaris Forge),Applied Digital · CoreWeave,Ellendale,ND,46,-98.53,Operating,68,250,,,https://epoch.ai/data/ai-data-centers CoreWeave Marble,CoreWeave,Marble,NC,35.17,-83.92,Operating,65,,,,https://epoch.ai/data/ai-data-centers CoreWeave Dalton,CoreWeave,Dalton,GA,34.73,-84.96,Operating,28,,,,https://epoch.ai/data/ai-data-centers CoreWeave Muskogee,CoreWeave,Muskogee,OK,35.71,-95.38,Being built,,100,,,https://epoch.ai/data/ai-data-centers CoreWeave Lancaster,CoreWeave,Lancaster,PA,40.06,-76.3,Being built,,,,,https://epoch.ai/data/ai-data-centers Lake Mariner (Core42 & Anthropic),TeraWulf · Fluidstack,Barker,NY,43.35,-78.55,Operating,100,,,Two AI deployments on one campus.,https://epoch.ai/data/ai-data-centers Anthropic Barber Lake,Cipher Mining · Anthropic,Colorado City,TX,32.4,-100.86,Being built,,300,,,https://epoch.ai/data/ai-data-centers Stream Phoenix,Stream Data Centers,Goodyear,AZ,33.42,-112.36,Operating,64,,,,https://epoch.ai/data/ai-data-centers Vantage TX1,Vantage,San Antonio,TX,29.4,-98.72,Operating,32,,,,https://epoch.ai/data/ai-data-centers xAI Atlanta,xAI (SpaceX),Atlanta,GA,33.78,-84.41,Operating,17,,,,https://epoch.ai/data/ai-data-centers PORTS Technology Campus,New Day Data Centers,Piketon,OH,39.07,-83,Being built,,10000,,Proposed at a former DOE uranium enrichment site.,https://www.electricchoice.com/datacenters/ Stratos AI Campus,O'Leary Digital,Lucin,UT,41.35,-113.91,Planned,,9000,,,https://www.electricchoice.com/datacenters/ New Era Lea Data Center,New Era Energy & Digital,Lea County,NM,32.7,-103.3,Planned,,7000,,,https://cleanview.co/data-centers/us PowerHouse Caldwell County,PowerHouse Data Centers,Uhland,TX,29.96,-97.79,Planned,,4000,,,https://www.electricchoice.com/datacenters/ Matrix Data Center Campus,MSB Global Services,Sulphur Springs,TX,33.14,-95.6,Planned,,3000,,,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Fermi America Project Matador,Fermi America,Carson County (Amarillo),TX,35.33,-101.55,Being built,,11000,,"7,570-acre AI and private power campus.",https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Poolside Project Horizon,Poolside AI,Fort Stockton,TX,30.89,-102.88,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Fundamental Data Ridgeline,Fundamental Data,Hambleton,WV,39.08,-79.64,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Buckeye Technology Park,Tract,Buckeye,AZ,33.37,-112.58,Planned,,1800,,,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Paducah GDP AI Campus,Brookfield · NextEra,Kevil,KY,37.09,-88.83,Planned,,1800,,,https://www.electricchoice.com/datacenters/ PowerHouse Grand Prairie,PowerHouse Data Centers,Grand Prairie,TX,32.7,-97,Being built,,1800,,,https://www.electricchoice.com/datacenters/ Wildcat Ridge AI Campus,Cornell Realty Management,Archbald,PA,41.5,-75.54,Planned,,1600,,,https://www.electricchoice.com/datacenters/ Core Scientific Pecos,Core Scientific,Pecos,TX,31.42,-103.49,Being built,,1500,,,https://www.electricchoice.com/datacenters/ Crusoe Victoria AI Factory,Crusoe,Victoria,TX,28.8,-97,Planned,,1500,,,https://www.electricchoice.com/datacenters/ Delta Gigasite,Creekstone Energy,Delta,UT,39.352,-112.577,Being built,,10000,,,https://www.electricchoice.com/datacenters/ PORTS-Pike Technology Campus,OpenAI · SB Energy · NVIDIA,Jasper,OH,39.05,-83.06,Planned,,8000,,,https://www.electricchoice.com/datacenters/ "Data City, Texas",Energy Abundance Development Corp.,Laredo,TX,27.55,-99.45,Planned,,5000,,,https://www.electricchoice.com/datacenters/ Homer City Energy Campus,Homer City Redevelopment,Homer City,PA,40.51,-79.195,Being built,,4500,,Built at a former coal power plant.,https://www.electricchoice.com/datacenters/ Joule Energy and Data Center Campus,Joule Capital Partners,Holden,UT,39.1,-112.27,Being built,,4000,,,https://www.electricchoice.com/datacenters/ Project Merlin (Helios II),Galaxy Digital,McGregor,TX,31.44,-97.41,Planned,,3500,,,https://www.electricchoice.com/datacenters/ Stak Energy North Slope,Stak Energy,North Slope,AK,70.2,-148.46,Planned,,3000,,,https://www.electricchoice.com/datacenters/ AWS North Creek Technology Campus,Amazon,"Mineral, Louisa County",VA,38.01,-77.91,Planned,,3000,,,https://www.electricchoice.com/datacenters/ Google Project Tembo,Google,Cheyenne,WY,41.09,-104.7,Being built,,2700,,In the Switchgrass Industrial Park; completion expected by 2031.,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa AWS Hobart Campus,Amazon,Hobart,IN,41.53,-87.255,Being built,,2400,,,https://www.electricchoice.com/datacenters/ Tract Hanover Technology Park,Tract,Ashland,VA,37.76,-77.48,Planned,,2400,,,https://www.electricchoice.com/datacenters/ Digital Realty Astra Enterprise Park,Digital Realty,De Soto,KS,38.98,-94.97,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Tract TRIC Park,Tract,Sparks,NV,39.555,-119.44,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Comanche Circle,Sailfish Digital Ventures,Tolar,TX,32.39,-97.92,Planned,,2000,,,https://www.electricchoice.com/datacenters/ IREN Sweetwater Campus,IREN,Sweetwater,TX,32.47,-100.41,Being built,,2000,,,https://www.electricchoice.com/datacenters/ Microsoft Pecos Campus,Microsoft,Pecos,TX,31.45,-103.53,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Tract Caldwell Valley Technology Park,Tract,Uhland,TX,29.99,-97.76,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Monarch Compute Campus,Nscale,Point Pleasant,WV,38.845,-82.137,Planned,,2000,,,https://www.electricchoice.com/datacenters/ Project Bunkhouse,Taurus · Digital Realty,Stilesboro,GA,34.11,-84.9,Planned,,1830,,,https://www.electricchoice.com/datacenters/ Joliet Technology Center,Hillwood · PowerHouse,Joliet,IL,41.525,-88.08,Planned,,1800,,,https://www.electricchoice.com/datacenters/ Project Cardinal,Pioneer Development,Yorkville,IL,41.64,-88.447,Planned,,1800,,,https://www.electricchoice.com/datacenters/ Stark Hallam Hyperscale,Stark Power,Hallam,NE,40.537,-96.786,Planned,,1700,,,https://www.electricchoice.com/datacenters/ Tract Silver Springs Park,Tract,Silver Springs,NV,39.415,-119.225,Planned,,1600,,,https://www.electricchoice.com/datacenters/ IREN SE Oklahoma Campus,IREN,Clayton,OK,34.588,-95.355,Planned,,1600,,,https://www.electricchoice.com/datacenters/ IREN Woods County Campus,IREN,Alva,OK,36.805,-98.667,Planned,,1600,,,https://www.electricchoice.com/datacenters/ Hassayampa Ranch Data Center,Arizona Land Consulting,Tonopah,AZ,33.493,-112.937,Planned,,1500,,,https://www.electricchoice.com/datacenters/ AWS Project Galaxy,Amazon,Sidney,OH,40.284,-84.156,Being built,,1500,,,https://www.electricchoice.com/datacenters/ Cloverleaf Project Open Sky,Cloverleaf Infrastructure,Piedmont,OK,35.642,-97.746,Planned,,1500,,,https://www.electricchoice.com/datacenters/ AWS Wilderness Crossing,Amazon,Orange County,VA,38.3,-77.73,Planned,,1500,,First phase expected around 2027.,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa Kahla Data Center,Belltown Power,"Marquez, Leon County",TX,31.24,-96.25,Planned,,1500,,Proposed.,https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa DCIP DeSoto County AI Data Center,DCIP Group,DeSoto County,FL,27.19,-81.81,Planned,,4000,,,https://cleanview.co/data-centers/us AWS GW Ranch,Amazon,Pecos,TX,31.38,-103.42,Planned,,4000,,,https://cleanview.co/data-centers/us Plainsmen Project Thunderbird,Plainsmen Holdings,Garfield County,OK,36.4,-97.78,Planned,,3300,,,https://cleanview.co/data-centers/us Vermaland La Osa Campus,Vermaland,Pinal County,AZ,32.75,-111.65,Planned,,3000,,,https://cleanview.co/data-centers/us EdgeCore Mesa (PH03),EdgeCore,Mesa,AZ,33.348,-111.617,Operating,450,,,,https://cleanview.co/data-centers/us Google West Memphis,Google,West Memphis,AR,35.15,-90.18,Being built,,,,$4 billion campus; broke ground October 2025.,https://www.datacenterdynamics.com/en/news/google-confirmed-to-be-behind-west-memphis-data-center-project-in-arkansas/ Google Haskell County (2 sites),Google,Haskell County,TX,33.16,-99.73,Being built,,,,Part of Google's $40 billion Texas plan; one site paired with new solar and batteries.,https://finance.yahoo.com/news/google-build-three-data-centers-000229397.html Meta El Paso,Meta,El Paso,TX,31.8,-106.2,Being built,,1000,,About 1 GW; Meta raised its investment to $10 billion.,https://www.bloomberg.com/news/articles/2025-10-15/meta-building-new-gigawatt-sized-data-center-in-texas